Friday, March 31, 2006

Tiling, tiling, tiling

Tiling, tiling, tiling. That is about all I have to report at the moment. We have now stuck up all the wall tiles in the main bathroom/toilet and laundry including grouting. Lani did a sensation job of sticking up most of the tiles and grouting while I did most of the cutting and fiddley bits. Now all that is left is for Lani to complete the silicon work and some finishing touch ups while I will install the new vanity, toilet and laundry tub. The new shower screen was measured up today and should be installed in about 8 working days. Hopefully it will be done before Mum and Dad visit at Easter.

Once the bathroom and laundry are complete that will be the last of the major projects around the house for a while. I hope to do a lot more leisure activities like fishing and swimming at the beach. I’m looking forward to a pleasant winter.

0 Comments:

Post a Comment

<< Home